Uploaded image for project: 'CORD'
  1. CORD
  2. CORD-2726

Rebooting of a spine leads to "physical link down" on all PPOD nodes

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: To Do (View Workflow)
    • Priority: Blocker
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Fabric, ONOS
    • Labels:
      None
    • Story Points:
      1

      Description

      In a two-spine configuration rebooting just one of the spines leads to shutting down the ports on all the leafs. The result is a complete disintegration of vCMTS.

      When one spine is lost, ONOS for some reason thinks that the lost link was the only one remaining, while the other spine if there and is fine.

      I suppose that this was introduced in the recent commit

      commit e9c8971e9eddbb9a03ba4e0e22086ce3a47c36a9
      Author: Saurav Das <sauravdas@alumni.stanford.edu>
      Date:   Thu Jan 18 12:07:33 2018 -0800
      
          Take down edge ports on a leaf switch when all uplinks are gone
          
          - Bug fix for case when all uplinks are gone, but dual-homed host continues to send packets to switch;
            We now administratively take down the host port to force the host to use the other leaf in the pair.
          - Restructured SR manager by creating a LinkHandler
          - fixed/added some log messages
          
          Change-Id: I3722cd364dc8798b16891519bec165627e92bd87
      
      
      

        Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

          Activity

            People

            Assignee:
            sauravdas Saurav Das
            Reporter:
            dbg Daniel Ginsburg
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:

                Gerrit Reviews

                There are no open Gerrit changes