Uploaded image for project: 'A-CORD'
  1. A-CORD
  2. ACORD-9

We need to define a scope for subsequent A-CORD activities

    XMLWordPrintable

    Details

    • Type: Epic
    • Status: To Do (View Workflow)
    • Priority: Medium
    • Resolution: Unresolved
    • Labels:
      None
    • Epic Name:
      Prepare a Requirements Document
    • Story Points:
      40

      Description

      Tom Tofigh (AT&T) and Sandhya Narayan (Verizon) are going to take the lead on this.

        Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

          Activity

            People

            Assignee:
            Unassigned
            Reporter:
            boraeliacik_1 Bora Eliacik
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:

                Gerrit Reviews

                There are no open Gerrit changes